106 N. Harrison Street, Easton, MD 21601
410.770.9081
Coastal Resilience
Queenstown, Maryland
RAUCH provided engineering, design, environmental services, construction inspection, and construction management for waterway improvements in Queenstown funded by the Maryland Department of Natural Resources. Improvements included a one-mile-long living shoreline with a kayak launch, bulkhead and dock repairs, and removal of 662 cubic yards of dredge material. The living shoreline provides nutrient pollution reductions supporting the state's Watershed Improvement Plan goals.
Project Photography












What we delivered
1-mile living shoreline with mud sill design, cabled logs, and jute blanket
Kayak launch adjacent to Town's wastewater treatment plant
Bulkhead and landing improvements; dock cap board, decking, and bench replacement
Removal of 662 cu. yd. of sediment and dredge material
Compliance with USACE, Maryland DNR, and MDE requirements
Get in touch
Every project starts the same way: with a conversation about what matters most to you. Let's sit down and talk about yours.