106 N. Harrison Street, Easton, MD 21601
410.770.9081
Parks & Recreation
Easton, Maryland
RAUCH provided civil engineering, design, survey, environmental services, and permitting for Phase II and Phase III of the Town of Easton's Rails to Trails expansion. Phase II extended the existing rail trail from Aurora Street to Tubman Drive. Phase III connected Port Street to Aulds Alley. Features include benches, landscaping, and ADA-accessible elements.
What we delivered
Existing conditions surveys and base sheet creation
Structural review of retaining wall
Stormwater management design and wetlands investigations
Pedestrian footbridge design
Coordination with Town of Easton, MDOT, MDE, and other agencies
Get in touch
Every project starts the same way: with a conversation about what matters most to you. Let's sit down and talk about yours.